The most realistic estimate of the time required to complete an activity is referred to as​ what?
a. slack time
b. optimistic time
c. most likely time
d. pessimistic time

Respuesta :

sydneybottom
sydneybottom sydneybottom
  • 11-01-2018
I would say B. optimistic time
Answer Link

Otras preguntas

The relationship between the Fahrenheit (F) and Celsius (C) temperature scales is given by the linear function below. F = 9/5 C+32 (a) What is the slope of the
When do you think that the Silver American Eagle will peak again, like it did in 2011? Do you think it would go back up? And how much do you think it will be wo
sentence has one word that is incorrect. 24 People have to be a certain hight before they are allowed to go on the ride.
goitre is rare among people living in coastal areas. find a reason behind this phenomenon.
a sphere has a volume of 4500pi cubic inches. find the surface area of the sphere.
x and y are two different numbers selected from the first fifty counting numbers from 1 to 50 inclusive. what is the largest value that (x+y) / (x-y) can have?
How do I solve this 2x2+ 2x2 -2+2x2=
what is the pH value of MgSO4?
In which direction will this parabola open? x=53(y+17)^2-41
Did Spain conquer the Incas and Aztecs for gold?