sanchezd13154 sanchezd13154
  • 08-07-2017
  • Business
contestada

why do pre construction and design specialists typically take an interdisciplinary to their work

Respuesta :

Erudite1
Erudite1 Erudite1
  • 14-07-2017
Pre-construction activities involves planning, coordinating and control of a project from the very beginning to the end of the project in order to produce to produce a financially viable project. Construction and design specialists typically take an interdisciplinary approach to their work in order to draw on a varied creative tool set. 
Answer Link

Otras preguntas

Why are non conventional resources important?
The type of annuity that can be purchased with one monetary deposit is called a(n)
Whats the number 3469131824
Why are the boys and their father so affected by the gift raha?
Sam threw a stone horizontally at a speed of 5m/s from a 9.8 m tall building. how much time does the stone take to hit the ground?
When an attacker attempts to gain access to a user's computer by stealing the encrypted file containing the password hash that would be __________?
An ideal parallel-plate capacitor consists of a set of two parallel plates of area a separated by a very small distance d. when this capacitor is connected to a
Which law established martial law in the South after the Civil War? the vagrancy laws the Tenure of Office Act the Civil Rights Act of 1866 the Reconstruction A
The bridegroom came with a friend to inspect the bride. Her parents were dizzy with anxiety and fear when they saw the god arrive to select the beast for his sa
one kind of evidence that supports wegeners hypothesis is that