pamacdog
pamacdog pamacdog
  • 10-10-2021
  • English
contestada

all stakeholders ___ on time for the meeting. a. can't b. have to c.must be d. mustn't​

Respuesta :

mata03
mata03 mata03
  • 10-10-2021
All stakeholder (C.) must be on time for the meeting.
Answer Link

Otras preguntas

How long did the protests at little rock nine last?
Georgia plays major roles in both the national and global economy through tourism, port expansion, and the film industry. Which statement provides the BEST evi
Leah was confident she would someday become a therapist,or a social worker.
Which conjunctive adverb best connects the independent clauses in this sentence? Justin was hungry for something sweet; _____, he wanted strawberries. 1.mean
The isosceles trapezoid is part of an isosceles triangle with a 36° vertex angle. What is the measure of an acute base angle of the trapezoid? What is the measu
Each cracker in the stack has a diameter of 2 inches. The height of the stack is 7.5 inches. What is the volume of the stack?
Celeste has a lot going on in her life: she's a volunteer at a community center for children, she works weekends as a receptionist, she babysits her nephews eve
If you know the length of a rectangle, and you know its area, what formula would you use to find the missing side width and how would you solve the equation for
In a survey 9/10 people said they preferred Super Cola to Basic Cola. if the survey is accurate, how many people out of 1000 would you expect to prefer super Co
what does the direct rule and indirect rule have in common