browniebear36 browniebear36
  • 06-10-2021
  • Mathematics
contestada

maria can shovel snow from her driveway in 45 minutes. Jim can do the same job in 40 minutes. How long would it take Sue and Jim to shovel the driveway if they worked together?​

Respuesta :

2026kvelde 2026kvelde
  • 06-10-2021

I am pretty sure the answer is 28.7 min.

Answer Link

Otras preguntas

What is a multiplication
In art, the material used by an artist to create a work of art is called the ___________. a. motif c. tools b. plane d. medium
why do people form political parties
A 75-kg refrigerator is located on the 70th floor of a skyscraper (300meters a over the ground) What is the potential energy of the refrigerator? #PLEASE HELP
Which of the following would increase friction? A. Motor oil B. Soap C. Sand D. Water
what is the relation between the values of the given digits the 6 in 660
Ruins of what settlement show that buildings were constructed of oven-baked bricks
Your sister is considering two different shapes for her garden. One is a square with side lengths of 3.5 meters and the other is a circle with a diameter of 4 m
What is the task of the living?
Which of the following is not an authoritarian form of government? A. Absolute monarchy B. Totalitarianism C. Direct democracy D. Dictatorship