Sprint Planning is the only occasion where the Development Team estimates the Product Backlog Items A. True, because without estimate, the team cannot plan what can go into the Sprint B. False, estimation of Product Backlog Items is a continuous event throughout

Respuesta :

thomltaylor
thomltaylor thomltaylor
  • 06-11-2020

Answer:

true

Explanation:

Answer Link

Otras preguntas

Describe the origin of the oxygen in the atmosphere
The Conditional Formatting function in Excel allows you to: A.)Automatically apply formatting based on specific rules or conditions being met. B.)Automatically
The rate of alcohol involvement among drivers involved in fatal collision's was four times higher _______.
Knowledge capture includes discovery, organization, and integration of knowledge into the ___.
abs(sin(x) - sin(y)) ≤ abs(x-y)
See picture below!!!!!!!!!!!
What if the snake was 15 inches it makes a circle 5 times how many inches is each circle
Write the product 5 x 1 1/6 as amixed number
Which of the following is the correct name for the compound hgs? mercury sulfide mercury (i) sulfide mercury (ii) sulfide mercury monosulfide?
In which sentence is the underlined word a participle? jumping