Calculate the work done when a force of 500N moves an object 20m. and (B) if it
took 10 seconds to move it, what was the power? *

Respuesta :

Answer:

work done = force multiplied by distance covered,which is 500n multiplied by 20 m= 10000nm

power= work done/time

p= 10000/10

p=1000