alcatrazmango3664 alcatrazmango3664
  • 10-02-2020
  • Social Studies
contestada

In slab placement, what comes directly before concrete floating? Select one: a. Formwork placement b. Curing c. Troweling d. Pouring e. Strike-off

Respuesta :

bratislava bratislava
  • 11-02-2020

Answer:

e. Strike-off

Explanation:

  • The precast suspended slabs are considered by pouring the slabs in a framework of the slabs and then lifting the slabs into suspended postilions in the structure.
Answer Link

Otras preguntas

An experiment consists of rolling two fair number cubes. What is the probability that the sum of the two numbers will be 8? Express your answer as a fraction in
is steak biotic or abiotic
Which ordered pair is in Quadrant IV? A. (–3, –5) B. (–3, 5) C. (5, –3) D. (5, 3)
Just want you check if my answer is right...i'm not good in math. Ana paid 1/4 of her money for a pair of shoes and 1/5 of it for a shoulder bag. She later spen
A function f(x) s defined as f(x)=-8x^2. What is f(-3)?
what is a wavelength and give me a sentence with that word
x - 35 > 15 pleases solve
Of the runners in a marathon through northeastern Pennsylvania, 94.12% finished the race. If 2,125 runner started the race, how many finish the race?
Solve irrational equation pls
every 10 seconds a pendulum completes 2 cycles. what are the period and frequency of this pendulum