kathymcgee9521 kathymcgee9521
  • 08-01-2020
  • Business
contestada

The activity base selected determines whether a cost behaves as a variable cost or fixed cost.

A. True
B. False

Respuesta :

ahmedgodtrust
ahmedgodtrust ahmedgodtrust
  • 09-01-2020

Answer:

The activity base selected determines whether a cost behaves as a variable cost or fixed cost. This statement is true.

The correct answer is A.

Explanation:

Variable cost is a cost that fluctuates with respect to activity level while  fixed cost is a cost that remains unchanged irrespective of activity level.

Thus, the activity base selected determines whether whether a cost is fixed or variable.

Answer Link

Otras preguntas

plzz help me on this write .219 in word form!?? plzz help me on that
Q: Philip says truth only one day in a week.Hint 1: Days are Sun, Mon and so on.Hint 2: One day he says "I lie on Mon and Tue".Hint 3: Next day he says "Today i
Question: Explain how freedoms for African Americans were socially, politically, and economically limited from 1865 to 1900?
how is the use of science related to its context in society
Jabary is thinking of 3 numbers the greatest number is twice as large as the least number the middle number is 3 more than the least number the sum of the 3 num
Describe two ways to reduce air pollution and slow climate change.
Should Canada Treat Water As a Resource to Be Traded?
In which region of colonies did the Salem Witch trials take place?
Simplify this equation. 6 + 7r - 4 × 11
Most of the water in plants is lost through the ____.