erikavengua19
erikavengua19 erikavengua19
  • 06-12-2019
  • Mathematics
contestada

A concreter has a 36kg bag of cement mix on the back of his ute .the bag broke and 1/10 was lost.How much cement mix was left in the bag.?

Respuesta :

roundadworthy
roundadworthy roundadworthy
  • 06-12-2019

Answer:

32.4 kg were left in the bag

Step-by-step explanation:

1. Let's check the information provided for answering the question:

Weight of the bag of cement = 36 kg

Fraction of the cement bag lost = 1/10

2. How much cement mix was left in the bag?

For calculating how much cement was left, we use this equation:

x = Cement left in the bag

x = 36 - 1/10 * (36)

x = 36 - 36/10

10x = 360 - 36 (Multiplying by 10 at both sides)

10x = 324

x = 32.4 kg

Answer Link

Otras preguntas

X TRIVIAIn Bryan Adams'"Summer of '69,"which band member quit?Jody​
Read the excerpt from Julius Caesar, act 1, scene 2. CASCA. Why, there was a crown offered him: and being offered him, he put it by with the back of his hand,
What is an enzyme in biology
Convert: 31 ft = _yd__ft
i have five quick modern world studies questions. i will mark you as brainliest. 1. what was a cause of the cold war? a. construction of the berlin wall b. form
Solve the equation 8x + 4y= -24 for y​
Read the conversation from the lecture. Then answer the questions that follow, Teresa: ¿Tiene usted una mesa para dos personas? Mesero: Sí, señorita. Por aquí,
Subtract these polynomials (6x^2-x+8) - (x^2+2) A) 7x^2-x+6 B) 5x-x+6 C) 5x^2-x+10 D) 7x^2-x+10 Which one is it??
The distance a car travels at a rate of 65 mph is a function of the time, t, the car travels. Express this function and evaluate it for f(3.5).
Evaluate x2 + 3x – 7+ 8 when x = 4.