ZariaZ8005 ZariaZ8005
  • 09-04-2019
  • Mathematics
contestada

It took the construction company 63 days to complete the building. How many weeks did it take? (1 week = 7 days)

Respuesta :

Brennamm Brennamm
  • 09-04-2019

Answer:

It took 9 weeks, 63/7 = 9

Step-by-step explanation:

Answer Link

Otras preguntas

what minerals are found in north korea
WHAT IS THE ANSWER TO 0.16PSQUARED-0.0025
What is 8,450 ROUND. TO THE NEAREST THOUSAND
Solve equation e^{2x} + 2e^{x} −3 = 0
What is the slope of the line whose equation is 8x-4y=8?
Use 425 x 79 = 33575 to work out 4.25 x 79 =
WHAT IS THE ANSWER TO 0.16PSQUARED-0.0025
what two categorical ways of thinking about matter are discussed in the passage?
What is the slope of the line whose equation is 8x-4y=8?
If x=2y+3 and 4x-5y=9, what is the value of y?