A project manager is interested in crashing a project with variable activity times. Which of the following tools should he/she employ?
O PERT
O CPM
O GANTT CHART Either
O PERT or CPM PERT, CPM, or a Gantt chart are fine

Respuesta :

Otras preguntas

Distance (m) 1 2 Time(s) In a automobile brake test the driver slammed on the brakes to see how long it would take the car to stop completely. See the graph. Ab
(5x + ___)^2 = ___ · x^2+70xy + ___
How can the depletion width be measured experimentally?​
Convert 0/17 to a decimal
what were the main type of factories in the 1800s
what does dios mean in English​
Which phylum forms a connection between the chordates and the nonchordates? The phylum forms an evolutionary connection between the nonchordates and the chorda
How could having no national court system affect a family that moved from one state to another?
A population of mammals leaves an ecosystem because of increased temperatures and decreased rainfall. What’s the reason for this shift? A. change in abiotic f
36/5 ÷ 9 reduce to lowest terms ​