brandonlatortu7504 brandonlatortu7504
  • 08-02-2022
  • Business
contestada

An expected output over the life of a project would be classified as.

Respuesta :

toomy12s toomy12s
  • 08-02-2022
An expected output over the life of a project would be classified as a deliverable.

The answer is: A deliverable
Answer Link

Otras preguntas

Manuel builds and sells wooden crates. He made this table to show how much his crates cost in dollars. Number of crates 2 4 6 8 Cost ($) $25 $45 $6
During photosynthesis, where do the light and dark reactions occur?
The campers in cabin A walked 1/4 of 13 miles to Otter Ridge. How many miles did they walk?
Select all that apply. Which of the following were developed during World War II? Decca LORAN Sonar Sofar Radio Direction Finder
Find the 31st term of the following sequence. 9, 15, 21, ...
Working with others in a group decide how the structure of each connective tissue suits its function
• explain the differences between the x and y chromosomes and how they differ from the rest of human chromosomes.
An organelle inside eukaryotic cells where the dna is located
Crude oil can be separated into its constituent parts based on their boiling points. What technique uses this principle?
I need help in Journalism