KeatonMillsaps KeatonMillsaps
  • 07-02-2022
  • Mathematics
contestada

You need some dozer work on a field to level a washout that occurred last spring. Mr. Miller charges $60 an hour for his work. He worked 12 hours to correct the problem. How much did Mr. Miller earn?

Respuesta :

s1m1
s1m1 s1m1
  • 07-02-2022

Answer:

$720

Step-by-step explanation:

$60 for 1 hour

$ ? for 12 hours

For 12 hours will have $60 twelve time.

? = 12x60 = $720

Answer Link

Otras preguntas

90 ft/h yd/min round to the nearest hundredth
What was one of John Marshall’s important accomplishments as Chief Justice of the Supreme Court? A. establishing the power of judicial review B. appointing Wil
What is the simplest form for 8/10 divided by 1 5/6?
Numbers greater than 20 that have 9 as a factor
What is 1.25 in expanded form
Whats the answer to 8.54 to the nearest tenth
a substance with ph of 10 is called
The transmission of heat requiring the movement of a liquid or a gas is a. convection. b. conduction. c. transduction. d. radiation.
The cost of a school banquet is $95 plus $15 for each person attending. Write an equation that gives total cost as a function of the number of people attending.
20,000 pounds equals how many English tons? A. 2,000 tons B. 10,000 tons C. 1 ton D. 10 tons