how many miles of the road does the crew have left to pave after 11 days?

Respuesta :

lynn18202
lynn18202 lynn18202
  • 08-10-2021
A construction crew needs to pave a road that is 205 miles long. The crew paves 8 miles of the road each day. The length, L (in miles), that is left to be paved after d days is given by the following function.

L(d) = 205 - 8d
Answer Link

Otras preguntas

The total cost of renting a car is $30.00 for each day the car is rented plus 28 1/2 ¢ for each mile the car is driven. What is the total cost of renting the ca
Find the greatest common factor (gcf) of 15 and 35
How do archaebacteria move?
a rational number between 1.7 and 1.8
which property is illustrated by the equation (a+b)+c=c+(a+b)
If the atmosphere is like a greenhouse, what parts of it function as the "glass"?
Stanley puts $100 in the bank for two years at 5 % interest compounded annually. At the end of the two years, what is his balance?
how did geography affect the development of athens as a city state
What is the acceleration of a 6.4 kilogram bowling ball if a force of 12 N is applied to it?
81 is 54% of what number