A construction project is scheduled to take a total of 480 days .The building will be 40 level high .5 levels were completed in 95 days.

Respuesta :

2037418
2037418 2037418
  • 06-10-2021

Answer:

?????

Explanation:

whats the question

Answer Link

Otras preguntas

The most abundant mineral in lithogenous sediments is __________.
Which word in this excerpt from act I, scene I, of Richard III means “to listen”?
can someone help me with this factoring problem? I forgot how to factor. Factor completely −3x2 + 6x − 9. −3(x2 − 2x + 3) −1(x2 − 6x + 9) −3x(x2 − 2x + 3) −
Harmony in red by henri matisse (1909) is an example of __________, a short-lived art movement which featured radically simplified and intensely colored scenes.
1. A small plane traveled from Warsaw to Rome, averaging 164 miles per hour. The trip took 2 hours. What is the distance from Warsaw to Rome?
The standard deviation of a sample of 100 observations equals 64. the variance of the sample equals:
The _________ specifies the station that sent the frame.
Solve the equation for x [tex] \frac{8 + x}{x} - 5 = 0[/tex]
3.2 cubic feet = how many inches ?
In 1998, the disney corporation urged passage of a law that would extend the right of artists or writers to protect their work. disney was successful, and congr