In a project schedule, which types of dependencies are most common?

Respuesta :

eylumamaho7
eylumamaho7 eylumamaho7
  • 07-05-2021
Finish to start dependency- This is the most common type of dependency in project management as well as real life.
Answer Link
iwannak iwannak
  • 13-05-2021

Answer:

Finish to Start, finish to finish.

Explanation:

Answer Link

Otras preguntas

what are two modern revolutions?
One of the economic challenges Japan has faced in recent years is A. isolation. B. limited government. C. unlimited government. D. recession.
The density of a fish tank is 0.3fish over feet cubed. There are 15 fish in the tank. What is the volume of the tank?
Which event might be seen as King's greatest accomplishment as a Civil Rights leader? a. March on Washington b. the "I Have A Dream" speech c. leading a march a
each of the 28 students in romis class raised at least $25 during the jump a thon. what is the least amount of money the class raised?
what kinds of technology advances have made migration easier?
if five notebooks cost 5.25 how much would three notebooks cost
What was the name of King's first book? a. Stride Toward Freedom b. Dreamer c. Why We Can't Wait d. We Shall Overcome
Where did the Hebrews escape from in the Exodus? A. Canaan B. Syrian Desert C. Egypt (Very confused on this one. Looked at wikipedia :P)
In which sentence do the capitalized words represent a prepositional phrase? A. I am not going TO RUN out of patience. B. The conductor CALLED OUT, "All aboard