13bluedream
13bluedream 13bluedream
  • 09-02-2021
  • Mathematics
contestada

What is the quantity of work done when a crane lifts a 100-N block from 2 m above the ground to 6 m above the ground?

A. 100 J
B. 200 J
C. 400 J
D. 600 J

Respuesta :

LxstRxmeo
LxstRxmeo LxstRxmeo
  • 09-02-2021
The correct answer would be

C. 400 J
Answer Link
cupelsa199 cupelsa199
  • 28-04-2021

Answer:

400j

Step-by-step explanation:

Answer Link

Otras preguntas

The melting point of the metal potassium is 63.5c, while that of titanium is 1660c. what explanation can be given for this great difference in melting temperatu
Is the Square root of 17 irrational or rational
Help I can’t figure out (a)
What is 50+ (100x99 = what
A manager engaged in the management function of ____ is determining organizational goals and the means for achieving them.a. planningb. organizingc. leadingd. h
discuss 2 ways the cells are alike
where did christianity originate Egypt Greece Judea Rome
What is the value of the 6 in 6,720,341
Vance has learned to voluntarily control the activation of his autonomic nervous system as part of the treatment for an anxiety disorder. this is an example of
In sickle cell anemia, there is a replacement in the amino acid sequence of hemoglobin of glutamic acid by valine. what is the difference between glutamic acid