m7k399jigg m7k399jigg
  • 07-10-2020
  • Mathematics
contestada

The problem C(x)=25x+50 represents the labor coat in dollars for quick cedar to build a deck where x is the number of hours of labor

Respuesta :

elizabethchilds elizabethchilds
  • 07-10-2020

Answer: 18.6 or 93/5

Step-by-step explanation:

See attached picture

Ver imagen elizabethchilds
Answer Link

Otras preguntas

The amount of sunlight received at Earth's surface fluctuates more at the poles than the equator. true or false? Explain please
about working of geyser and prepare a report
In the rock cycle, rocks can change into three different forms. These are _____.
People who travel to a different country and settle there are called
Patients suffering from cholera are given a saline drip because ??
In 1935 Mussolini attacked Ethiopia. Which organization was supposed to (but failed) help Ethiopia?
In what phase of meiosis are tetrads separated as homologous chromosomes are pulled to opposite poles of the cell
Explain the process that occurs when a flowering plant reproduces.
A construction job requires 16 pieces of steel, each 7.96 ft long.  What length of steel is needed?
The Articles of Confederation placed most government power and responsibility with the?