sapta098229
sapta098229 sapta098229
  • 09-08-2020
  • Computers and Technology
contestada

3. Explain why the process of project planning is iterative and
why a plan must be continually reviewed during a software
project.
Ans:​

Respuesta :

ghaileflores124
ghaileflores124 ghaileflores124
  • 12-08-2020

Answer:

because they inspecting or checking how there works good or not good there are under there work what a result cause they want a good and beautiful work

Answer Link

Otras preguntas

A person is said to be ____ if a laboratory test detects the presence of HIV antibodies in the person's blood. A. Hiv-infected B. Hiv-positive C.hiv-viral D.hiv
If y varies directly as x and y is 48 when x is 6 which expression can be used to find the value of y when x is 2
Suppose you and a partner want to make a recipe for 25 friends. Adjust the amount of each ingredient below to 25 servings. Facts: *25 friends Recipe for 100 ser
What is 1.63 + m- .12=
water is less dense as a solid than a liquid. true or false
kenya plans to make a down payment plus monthly payments in order to buy a motorcycle. at another dealer, she would pay $2500 down and $150 each month. at anoth
A Russian mathmatician named Christian Goldbach came up with a theory that every even number can be written as the sum of two odd primes. Test Goldbach's theory
I don't remember how to do this
the daily dose of ampicillin for the treatment of an ear infection is 115 mg/kg of body weight. what is the daily dose for a 43-lb child?
jasmin e drank2 pints and brenda drank 3 pints if one pint of milk is equivalent to 2 cups of milk did jasmine and brenda each drink