Pert analysis computes the variance of the total project completion time as

Respuesta :

nalleitenw
nalleitenw nalleitenw
  • 10-03-2020

The correct answer is the sum of the variances of all activities on the critical path.

The Program Evaluation and Review Technique (PERT) is a tool used in project management to calculate the duration of a given activity, a set of activities, or even an entire project.

Critical Path Analysis and PERT Charts are powerful tools that help you schedule and manage complex projects.

Answer Link

Otras preguntas

Lauren took 12 hours to read a 360 page book. AT THIS RATE, how long will it take her to read a 400 page book? Please show work
Determine the domain and range of each relation a) { (1,2), (3,4), (5,6) } b) 3x + 4y = 12 c) y = √x+4
What are some of the properties of starches?
∠C and ​ ∠D ​ are vertical angles with m∠C=−2x+90 and m∠D=x−30 . What is m∠D ?
someone please help me
Danielle opens a credit card with an APR of 22.79% compounded monthly. How much is charged in interest this month if her balance is $1550?
I am making 50 cupcakes i need to measure flour which unit of measure would I use to measure the flour
Find the cost of 100gram at 85p per 1/2 kg?
what river drains the entire interior plains and is the longest river in North AMERICA
When the Framers decided to use population as a basis for tax rates, what debated issue was resolved? Whether to take steps to limit the slave trade Whether to