makaylarae1865 makaylarae1865
  • 06-01-2020
  • Social Studies
contestada

All of the following elements should be included in a project scope statement EXCEPT:

Respuesta :

estryzy
estryzy estryzy
  • 07-01-2020

Answer:

Names of the project team members

Explanation:

Of all the options provided, the only one that should not be in a scope statement is the names of the project team members. What can be in a project scope statement include the Project Scope, the Deliverables, the Product Scope, Assumptions and Constraints, Product Acceptance Criteria, and Out of Scope Activities.

Answer Link

Otras preguntas

What is the maximum mass of methane (CH4) that can be burned if only 1.0 g of oxygen is available and how do you figure it out?
Which two kingdoms have no one-celled organisms?
What are some adjectives that describe the name Kimberly. 3 adjectives for each letter.
About how tall should you be at age 12, about in 7th grade. And how about weight?
What does drainage basin mean in Social Studies?
Two cars start from rest at a red stop light. When the light turns green, both cars accelerate forward. The blue car accelerates uniformly at a rate of 5.8 m/s2
Two cars start from rest at a red stop light. When the light turns green, both cars accelerate forward. The blue car accelerates uniformly at a rate of 5.8 m/s2
There were four apples. Three apples fell from the tree. How many apples are on the tree now?
how did Pericles change the government of Athens???
Name two ways the archaea differ from bacteria